• HungarianMagyar
  • English (UK)

Survey with special goals:

Plot remodeling

  • Splitting
    • Splitting plots. We observe the local building acts. We make a plot remodeling  and an environmental impact study at the local government. If everything is correct, we start the procedure at the district land registry.
  • Fusion
    • Combining several plots. We observe the local building acts. We make a plot remodeling  and an environmental impact study at the local government. If everything is correct, we start the procedure at the district land registry.
  • Property line
    • Arrangement of neighbouring plots. In case of a moot question we make a diagrammatic drawing after the mutual consent and validate i tat the district land registry. After that an attorney is needed.
  • Setout
    • Setting out the property lines.
  • Indication/annulment of buildings
    • After building a new construction, we need an original, final and binding  Occupancy permit  or a Continuance licence.
    • In case of annulment  court ruling is needed about the demolition.
    • It is a special case when the building and the plot has a different owner. In this case, the building gets a separate topographical no. You my need an attorney to prepare the land use contract.
  • Registry of easement
    • Registry of rights and facts. May need attorney.
    • Plot easement: transit, drainage, public utility
    • Easement: public utility
    • Land use rights
  • Usage shares
    • The property has several owner, so it is an undivided joint property. In this case the ownership interest is important.
  • Land usage change
    • If the usage or utilization of the property changes, it needs a diagrammatic drawing and it must be registered at the district land registry. In this case there is a contribution. We can give you information about that before the procedure.
  • Coupling into municipal area
    • In case of a garden plot or an outer belt area, we make a a diagrammatic drawing of the changes.